RFC 1598 (rfc1598) - Page 2 of 7
PPP in X
Alternative Format: Original Text Document
RFC 1598 PPP in X.25 March 1994
2. Physical Layer Requirements
PPP treats X.25 framing as a bit synchronous link. The link MUST be
full-duplex, but MAY be either dedicated (permanent) or switched.
Interface Format
PPP presents an octet interface to the physical layer. There is
no provision for sub-octets to be supplied or accepted.
Transmission Rate
PPP does not impose any restrictions regarding transmission rate,
other than that of the particular X.25 interface.
Control Signals
Implementation of X.25 requires the provision of control signals,
which indicate when the link has become connected or disconnected.
These in turn provide the Up and Down events to the LCP state
machine.
Because PPP does not normally require the use of control signals,
the failure of such signals MUST NOT affect correct operation of
PPP. Implications are discussed in [2].
Encoding
The definition of various encodings is the responsibility of the
DTE/DCE equipment in use, and is outside the scope of this
specification.
While PPP will operate without regard to the underlying
representation of the bit stream, X.25 requires NRZ encoding.
3. The Data Link Layer
This specification uses the principles, terminology, and frame
structure described in "Multiprotocol Interconnect on X.25 and ISDN
in the Packet Mode" [4].
The purpose of this specification is not to document what is already
standardized in [4]. Instead, this document attempts to give a
concise summary and point out specific options and features used by
PPP.
Simpson