RFC 1224 (rfc1224) - Page 1 of 22
Techniques for managing asynchronously generated alerts
Alternative Format: Original Text Document
Network Working Group L. Steinberg
Request for Comments: 1224 IBM Corporation
May 1991
Techniques for Managing Asynchronously Generated Alerts
Status of this Memo
This memo defines common mechanisms for managing asynchronously
produced alerts in a manner consistent with current network
management protocols.
This memo specifies an Experimental Protocol for the Internet
community. Discussion and suggestions for improvement are requested.
Please refer to the current edition of the "IAB Official Protocol
Standards" for the standardization state and status of this protocol.
Distribution of this memo is unlimited.
Abstract
This RFC explores mechanisms to prevent a remotely managed entity
from burdening a manager or network with an unexpected amount of
network management information, and to ensure delivery of "important"
information. The focus is on controlling the flow of asynchronously
generated information, and not how the information is generated.
Table of Contents
1. Introduction................................................... 2
2. Problem Definition............................................. 3
2.1 Polling Advantages............................................ 3
(a) Reliable detection of failures............................... 3
(b) Reduced protocol complexity on managed entity................ 3
(c) Reduced performance impact on managed entity................. 3
(d) Reduced configuration requirements to manage remote entity... 4
2.2 Polling Disadvantages......................................... 4
(a) Response time for problem detection.......................... 4
(b) Volume of network management traffic generated............... 4
2.3 Alert Advantages.............................................. 5
(a) Real-time knowledge of problems.............................. 5
(b) Minimal amount of network management traffic................. 5
2.4 Alert Disadvantages........................................... 5
(a) Potential loss of critical information....................... 5
(b) Potential to over-inform a manager........................... 5
3. Specific Goals of this Memo.................................... 6
4. Compatibility with Existing Network Management Protocols....... 6
Steinberg