Making a check of all main signal levels in XCORE. Debugging the new cable from the parity checker to XCORE. Wiring the parity bit through the Cybernex XCORE interface. Getting any necessary power wiring done. Building a wall for the next dispack location. [ This RFC was put into machine readable form for entry ] [ into the online RFC archives by BBN Corp. under the ] [ direction of Alex McKenzie. 1/97 ]